ABOUT THE PROJECT
Landinfra is planning to establish an energy storage facility southwest of Kallinge.
The facility, consisting of a battery storage system in the form of containerized batteries, is planned to cover an area of approximately 2 hectares on the property Häggatorp 10:1. The installation is planned to have an installed capacity of around 70 MW.
Project status
The building permit application for the project, including related studies, was submitted in Q4 2024. The permit became legally binding in spring 2025.
Landinfra is continuously working on the technical design of the project to ensure the best possible design. In parallel, Landinfra is investigating the conditions for connecting the project to the power grid together with the electricity grid owner.
If you have any questions, please contact Daniel Bergvall. Contact information is available further down on this page.