ABOUT THE PROJECT

Landinfra is planning to establish an energy storage facility southeast of Knäred.

The facility, consisting of a battery storage system in the form of containerized batteries, is planned to cover an area of approximately 2 hectares on the property Lagered 12:1. The installation is planned to have an installed capacity of around 70 MW.

Project status

The building permit application for the project, including related studies, was submitted in Q4 2024. The permit became legally binding in spring 2025.

Landinfra is continuously working on the technical design of the project to ensure the best possible design. In parallel, Landinfra is investigating the conditions for connecting the project to the power grid together with the electricity grid owner.

If you have any questions, please contact Daniel Bergvall. Contact information is available further down on this page.

FACTS
Country: Sweden
Place: Laholm Municipality, Halland County
Technology: Energy storage
Phase: Development phase
Area: 2 hectares
Capacity: 70 MW