Eriksbråtberget wind project

ABOUT THE PROJECT

Landinfra is planning to establish a wind farm in Arvika municipality – in an area located southeast of the community of Treskog, north of Gunnarskog. The project is run in collaboration with landowner Stora Enso.

The wind farm is planned within an area of totally 320 hectares. If built, the wind farm could have a total installed capacity of around 90 MW, with an annual electricity production of approximately 315 GWh, equivalent to the yearly household electricity consumption of about 63 000 homes.

PROJECT UPDATE

The permit application for the project, including the related investigations, consultation report, and environmental impact assessment, was submitted during the fourth quarter of 2025. The project is currently being processed by the permitting authority.

Landinfra is continuously working on the technical design of the project to ensure the best possible design. In parallel, Landinfra is investigating the conditions for connecting the project to the power grid together with the electricity grid owner.

If you have any questions, please contact Daniel Bergvall or Greta Aurell. Contact information is available further down on this page.

FACTS
Country: Sweden
Place: Arvika municipality, Värmland
Technology: Wind power  + Energy storage
Phase: Development phase
Number of turbines: Max 9 turbines
Area: Ca 320 hectares
Capacity: Ca 90 MW

PROJECT CONTACTS

Project Manager
Daniel Bergvall
daniel.bergvall@landinfra-energy.com

Project Manager
Greta Aurell
greta.aurell@landinfra-energy.com